Saturday 3 June 2017

An Amble on the Arm



The Marina east arm to be precise. This arm is 0.7 miles long from the Undercliff to the end. A walk from the Marina bus-stop to the end and back is 2.5 miles.






The wave-screen. A swing or lifting bridge is planned which could eventually connect the end of this to the West Quay.





No comments:

Post a Comment

In event of difficulty in adding comment, email:- quedula@gmail.com